Build the bus
 
 
Sorry for slow updates, we’ve been working around the clock trying to make our deadline! AND we’re almost out of funding :(
 
Monday, Tuesday and Wednesday we had help from Daniel, Maggie, Brandon, Evan, Dan Uber, Jimmy “Vegas” Tanner, Keith, Krista, Sammy, Sarah and Abigail Haynie. We’re now down to nitty gritty slow detail work, and Maggie and Daniel (who’ve been at Build the Bus camp for three days now) are leaving Thursday. Friday we’ll have the Leasures. Wanna come help?
A little inside
Dan Uber measuring the non-plumb-level-or-square bus
Daniel, Evan and Dan
Daniel in mass assembly of Karl’s Booth design
Nothing is easy :)
Everybody helps
Evan gluing the second level
Brandon drilling access holes in the electrical conduit
Karl installing the conduit in the top bunk (There’s PLENTY of room!)
Brandon drilling access points for wires
Daniel doing 18 to life at the saw table!
Maggie installing conduit
Daniel measuring the air around the top bunk.
3rd Sawdust cleanout of the day
installed raceway
JIMMY! fleshing out the bathroom walls.
Keith and family building the booth seat cushion holders in the barn.
The work has caught up with the funds raised, and we’re running out of budget! Please help Build the Bus.